<sub id="p1nxx"><listing id="p1nxx"></listing></sub>

      <address id="p1nxx"><dfn id="p1nxx"><mark id="p1nxx"></mark></dfn></address>

        <sub id="p1nxx"><dfn id="p1nxx"><mark id="p1nxx"></mark></dfn></sub>
        <address id="p1nxx"><listing id="p1nxx"></listing></address>
        <address id="p1nxx"><dfn id="p1nxx"><ins id="p1nxx"></ins></dfn></address><address id="p1nxx"><var id="p1nxx"></var></address>
        <address id="p1nxx"><var id="p1nxx"><ins id="p1nxx"></ins></var></address>

        <thead id="p1nxx"><dfn id="p1nxx"><mark id="p1nxx"></mark></dfn></thead>

              <sub id="p1nxx"><var id="p1nxx"><ins id="p1nxx"></ins></var></sub>

              <sub id="p1nxx"><var id="p1nxx"></var></sub>
              <thead id="p1nxx"><var id="p1nxx"><output id="p1nxx"></output></var></thead>
              <address id="p1nxx"></address>
              <address id="p1nxx"><dfn id="p1nxx"></dfn></address>

              <sub id="p1nxx"><dfn id="p1nxx"><ins id="p1nxx"></ins></dfn></sub>

                  <sub id="p1nxx"><dfn id="p1nxx"><menuitem id="p1nxx"></menuitem></dfn></sub>

                  在线留言

                  message
                  1.连续电镀设备施工准备工作主要包括:了解设备基础的交付时间;熟悉安装的机械设备图纸、流程、安装专业施工图、安装技术文件、设备说明书、零部件装配公差配合技术要求和有关的国家标准、施工及验收规范等;调查设备及材料的供应情况;了解施工现场的条件及施工技术的复杂程度;了解人力、机具的部署情况等,根据所掌握的确切资料,编制施工组织设计和施工方案。

                  2.机械设备安装阶段:设备***位、找准方向、找正和调平,垫铁的设置,设备的灌浆,零、部件的清洗与装配。

                  3.机械设备试运转阶段:试运转的目的是进一步检查设备存在的缺陷并进行使用前***后的修理和调整,使设备的运行特性符合生产的需要。

                  试运转的步骤是:先空载,后负荷;先单机,后联动。必须在上一步骤检查合格后,才能进行下一步骤的运转。

                  4.竣工验收:竣工验收的主要依据有:施工单位与建设单位签订的合同或协议书;设计文件;机械设备安装工程施工及验收规范;进口设备应按合同的规定及国外厂家提供的文件进行验收。施工单位应提供的资料主要包括:竣工图或注明修改部分的施工图;主要材料的出厂合格证及检验报告;设备资料(说明书、合格证等);隐蔽工程记录和各工序的检验记录;重要部位的焊接记录;设备试运转记录等,并办理竣工验收证明书。机械设备安装工程作为一个分部工程既可以与管道、运用、电气、通风等相关工程流程组成一个单位工程进行竣工验收,也可以单独进行竣工验收工作。